Space Datacenter Feasibility, Part 2

The Best Case, As Drawn and Packed

One satellite at 550 km in a dawn-dusk orbit, Starship at $100/kg, solar arrays at $10/W, a radiator designed down to the engineering drawing, and a bus built up in SolidWorks. Launch is priced the way Starship sells it: by the flight, so how many satellites fit in the bay matters as much as their weight.

Everything is per kW-yr of compute: the space premium (arrays, radiators, bus, launch; not the GPUs, which you buy either way) spread over the satellite's life. It wins if it beats what the ground costs. Read the blog post or the notebook.

Results Live

Where the premium goes, per kW-yr

Each bar is one satellite's space premium spread over its compute life. The lines are the two ground yardsticks: space has to land left of them to win.

Longer life spreads the same hardware thinner

Premium against satellite (and GPU) life, with everything else as set. The array grows to cover more years of wear, which can cost a layer in the stack. The space-friendly yardstick writes the ground building off over the same life.

Launch price, and how much packing matters

Premium against Starship's price per kg of a full flight. Mass-limited assumes every flight leaves full by weight; the flat-pack and tower lines use how many actually fit in the bay.

What this models